Development Control Policy 4.3 – Planning for High-Pressure Gas Pipelines (DC 4.3)
Share Development Control Policy 4.3 – Planning for High-Pressure Gas Pipelines (DC 4.3) on Facebook
Share Development Control Policy 4.3 – Planning for High-Pressure Gas Pipelines (DC 4.3) on Twitter
Share Development Control Policy 4.3 – Planning for High-Pressure Gas Pipelines (DC 4.3) on Linkedin
Email Development Control Policy 4.3 – Planning for High-Pressure Gas Pipelines (DC 4.3) link
Consultation has concluded
Overview
The Western Australian Planning Commission (WAPC) is seeking public comment on the new Development Control Policy 4.3 – Planning for High-Pressure Gas Pipelines (DC 4.3).
It is intended that DC 4.3 will replace Planning Bulletin 87 – High-Pressure Gas Transmission Pipelines in the Perth Metropolitan Region. The documents include:
- A new Development Control policy providing guidance for planning near high-pressure gas pipelines across the State at all levels of the planning system.
- Draft Guidelines to provide explanatory information in support of DC 4.3 to ensure that the policy is interpreted and implemented correctly and consistently.
- Policy trigger distance mapping available at https://www.planning.wa.gov.au/PlanWA.asp.
Together, these documents will ensure that planning and development proposals address high-pressure gas pipelines appropriately and consistently in consultation with all relevant stakeholders.
This consultation is now closed.