- Annual Ambient Air (Dust) Monitoring Report referred to in the approved Environmental Management Plan; and/or
- Report/s required for planned discharge of treated wastewater into the onsite sump.
- A detailed decommissioning schedule of works with timeframes for each stage which must include the removal of all concrete batching plant equipment from the site;
- Temporary fencing, hoardings, gantries, and signage;
- Management of site generated noise;
- Management of vibration, dust, wind, and erosion;
- Management of any stormwater discharge;
- Waste management, recycling and safe off-site removal of any infrastructure and materials;
- The protection and repair of any damage to public realm infrastructure;
- Public communication and complaint handling procedures; and
- A Traffic Management Plan.
- On or before 31 December 2025, Holcim shall commence preliminary engagement with the City of Vincent and the Department of Water and Environmental Regulation in relation to the decommissioning of the plant, based upon the Holcim Closure Concept Report dated May 2025 and the accompanying Holcim Closure Concept Plan;
- On or before 30 June 2027, Holcim shall:
- Provide a summary of the feedback received on the Holcim Closure Concept Plan; and
- Submit for approval of the WAPC, a decommissioning plan based on the Holcim Closure Concept Plan as modified following engagement in 12(a) detailing structures proposed to be demolished, structures proposed to be retained, and other works associated with decommissioning.
- The structures identified to be demolished shall be removed and taken before 31 December 2028.
In which local government area is this proposed development located?
The City of Vincent.
What is a SAT review?
A SAT review of a development application refers to the process where an applicant makes an application to the State Administrative Tribunal (SAT) to review a planning decision. In this case, the applicant has applied to the SAT for a review of conditions 11-14 of the WAPC’s decision on 27 June 2024 to grant the concrete batching plant a conditional operation extension to December 2027.
Has there been any prior community consultation on this project?
Yes, the original development application was advertised in accordance with section 276(6) of the Planning and Development Act 2005 for public comment for a period of 38 days from 9 February to 18 March 2024.
How are the proposed amendments different to the approved conditions?
Existing Conditions | Proposed Conditions |
Condition 11 - Within six months of the concrete batching plant ceasing to operate, an investigation of soil and groundwater contamination at Lot 1001 (129) Claisebrook Road, Perth is to be carried out by a suitably qualified person to determine if remediation is required for a future sensitive or residential land use.
Condition 12 - Within 6 months of the completion of the investigation of soil and groundwater contamination, a report or reports shall be prepared by a suitably qualified person demonstrating that the investigations and remediations have been carried out in accordance with the Contaminated Sites Act 2003 and current Department of Water and Environmental Regulation contaminated sites guidelines. The report or report(s) must demonstrate to the satisfaction of the Western Australian Planning Commission, on advice from the City of Vincent and the Department of Water and Environmental Regulation. | Replace with: Condition 11 - Upon request, Holcim shall provide to the Western Australian Planning Commission: |
Condition 13 - Within 6 months of the concrete batching plant ceasing to operate, a Decommissioning Plan is to be submitted to the satisfaction of the Western Australian Planning Commission, on advice from the City of Vincent and the Department of Water and Environmental Regulation. The Decommissioning Plan shall be prepared by a suitably qualified person and include the following:
Condition 14 - The Decommissioning Plan shall be implemented within six (6) months of being approved to the satisfaction of the Western Australian Planning Commission, in consultation with the City of Vincent and the Department of Water and Environmental Regulation. | Replace with: Condition 12 - Decommissioning of the Plant shall be undertaken in accordance with the following: |
Who is the decision-maker for this application?
The reconsideration will be determined by the WAPC at a meeting which is open to the public, and the WAPC must give reasons for the decision.
When will this application be determined?
The WAPC is invited to reconsider its original decision by 4 September 2025. When a meeting date is set, submitters will be notified seven days in advance and will be able to apply to make a presentation (deputation).
Will I be advised about the outcome of the application?
If you agree to be contacted when you make your online submission, you will be notified of the application outcome.
Where can I get more information?
While public advertising is open, the application documents can be viewed on this page or in person at the Department’s Perth offices, Level 2, 140 William Street, Perth (by appointment).
Appointment requests and any enquiries related to the application should be directed to the Department by email to planningappeals@dplh.wa.gov.au
Electronic copies of the application documents can be viewed under the Key documents section.